You are here: Home page » news » products information » Dongfeng EQ2102 Series Off-road Motor User Manual - Structure and Operation - Main Vice Tank Conversion Switch

Dongfeng EQ2102 Series Off-road Motor User Manual - Structure and Operation - Main Vice Tank Conversion Switch

Views: 3     Author: Site Editor     Publish Time: 2021-08-02      Origin: Site

Main Oil tank conversion switch

Return the conversion switchker rod forward, the engine uses the fuel in the main tank, and the fuel in the oil tank is used backwards.

0QSQ02

1, oil tank extension pipe 2, main oil tank conversion switch

Note:

You should first use the main oil tank fuel, and then use the via tank fuel, otherwise the fuel will overflow from the main tank.

Air conditioning system (optional)

Tuyere arrangement

012302

Adjustment of wind blanking plate

By rotating the adjustment knob, the flow of the wind can be changed.

232002

1, tailor adjustment knob


control panel

08QW66602

1, fan switch 2, air conversion button 3, temperature conversion button 4, wind direction selection

Fan switch Four gear
Air conversion slide button

Fresh a natural ventilation

REC-indoor cycle

Temperature selection slip button

WARM is a temperature

Cool-low temperature

Wind direction selection slide button

Face a face hair blow

FOOT one foot blowing

DEF one window

Bi.Level The location shown on the right can realize the heating method of the top cooling and the heat of the foot. For a long time, the air conversion slide button must be located at \"REC \"


This article is reproduced from: Dongfeng Motor Corporation -Dongfeng EQ2102 / 2101G Series Off-road Motor User Manual

Hubei Off-Road Special Vehicle Co., Ltd.
Address: No. 6, Huimin Road, Maojian District, Shiyan City, Hubei Province, China
Tel: 86-719-8888190 Tel: 86-18986895008 / 86-18986890909 Email:fanya_trade@163.com
Copyright © 2021 Hubei Off-road Special Vehicle Co., Ltd. Record certificate number:Hubei ICP No. 20010516-3