You are here: Home page » news » Vehicle knowledge » Dongfeng EQ2102 Series Vietnam Motor User Manual - Structure and Operation - Main Pin Tank Transformation Switch

Dongfeng EQ2102 Series Vietnam Motor User Manual - Structure and Operation - Main Pin Tank Transformation Switch

Views: 3     Author: Site Editor     Publish Time: 2021-08-02      Origin: Site

Main tank conversion switch

Returns the forward switching rod forward, the engine uses the fuel in the main tank, and the fuel in the fuel tank is reversed.

0QSQ02.

1, tank extension tube 2, main tank conversion switch

notes:

You should first use the main tank fuel, then use the tank fuel, otherwise the fuel will overflow from the main can.

Air conditioning system (optional)

tuyerearrange

012302

Adjustment

By rotating the adjustment knob, you can change the flow of the wind.

232002

1, custom adjustment knob


control panel

08QW66602.

1, fan switch 2, air conversion button 3, temperature conversion button 4, wind direction selection

Fan switch Four equipment
Air conversion slide button

Fresh natural ventilation

REC-indoor cycle

Temperature selection slide button

Warm is a temperature

Frost

Wind direction selection slide button

Face face

One foot blowing

DEF a window

Bi.level. The position shown on the right side can realize the heating method of the top cooling and the heat of the foot. For a long time, the air-conditioned slide button must be in \\\"REC \\\"


This article is reproduced by: DongfengDongfeng EQ2102 / 2101G Series Vietnam Motor User Manual

Hubei Off-Road Special Vehicle Co., Ltd.
Address: No. 6, Huimin Road, Maojian District, Shiyan City, Hubei Province, China
Tel: 86-719-8888190 Tel: 86-18986895008 / 86-18986890909 Email:fanya_trade@163.com
Copyright © 2021 Hubei Off-road Special Vehicle Co., Ltd. Record certificate number:Hubei ICP No. 20010516-3