Views: 6 Author: Site Editor Publish Time: 2021-08-03 Origin: Site
Car connection operation
EQ2102, the EQ2102G trailer brake connection device is mounted on the rear beam of the frame, which is arranged as visual -a-050.
Dual Pipe Transfer Making (Control Connector) Dual Pipe Inflatable Making (Supply Solver Connector) Single Turning Offset System (Automatic Dynamic Switch)
1. The trailer connection operation should be carried out in the flat, turn the hand-controlled valve to the locked position, the spring brake gas chamber is opened in the normal state position (see page 22) and plug the wheel with a triangle pad.
2. Adjust the height of the traction ring of the trailer and the height of the traction hook.
3, connect the traction hook and the traction ring.
4. Connect the cable connector of the trailer with the tractor socket.
5. Connect the span hose joint to the output joint of the tractor.
Note:
1. The hose joint cannot be received.
2. When connecting to old artillery (single loop-off braking), use the trailer connection connector in the attachment to replace the original connector on the old artillery.
6. Separation switch before the pulling guide is opened.
7. Start the engine to raise the air pressure in the gas tube to a predetermined pressure.
8. Relax the hand-controlled valve to relieve the train.
9. Step on the brake pedal to confirm whether the drum brakes are working properly.
10. Confirm whether the drum light is working properly.
Trailer separation operation
1. Rand down the parking brake handle to the lock position, and hold the car wheel with a triangle pad.
2. Turn off the train brake separation switch.
3. Remove the power transmission cable and hose. After the hose is disassembled, the trailer is automatically braked.
4, open the traction hook, raise the traction ring from the traction hook. Make the tractor Xu Xu forward and separated from the trailer.
This article is reproduced from: Dongfeng Motor Company - \"Dongfeng EQ2102 / 2102G Series Off-road Motor User Manual\"