You are here: Home page » news

news

_DSC1382.jpg
Dongfeng EQ2102 Series Off-road Motor User Manual - Parameter and Feature - Assembly Structure (2)
08-14 2021

Steering System Power Steering System A) Double Bar Tree Steering Path: The outer diameter Ø480mm, the steering transmission is composed of a steering column and a steering drive shaft with two cross shafts universal joints. The steering drive shaft is divided into two parts: spline shaft and spline set. It can slide relatively. b) steering machine; integral power steering machine. The intermediate position transmission ratio is 20.4, c) The trapezoidal mechanism rear behind the front axle. Front wheel 主 主 主 定 定 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 轮 3 轮 轮 3 轮 轮 3 轮 轮

READ MORE
_DSC1394.jpg
Dongfeng EQ2102 Series Off-road Motors Handbook - Maintenance and Adjustment - Auxiliary Power Starting
08-13 2021

Auxiliary power starts are difficult to start due to battery powerless, engine starts, in order to start the vehicle available auxiliary power start. Connection program: 1. The engine is flameout with a good battery vehicle. 2. One end of the stretcher cable (red) is connected to the uncapable battery positive electrode terminal, and the other H-NO5-118 is connected to the positive electrode wiring 1 having the electric storage battery, and there is a battery column. Another end of another staller cable (black 2, no electric storage) is connected to the negative electrode 3 of a good battery, and the other end is connected to the vehicle chassis frame equipped with an electric storage battery, and must be allowed to stay away from the battery. . 3. After the stiffenser cable is connected, the vehicle engine without the electric storage battery is started. When the temperature is too low, the engine of the normal vehicle is operated by minutes, and the engine of the actuator vehicle is then started. 4. After the engine is started, the cable is removed in the reverse cable. Check tyre Air pressure and tread 1. Pressure table

READ MORE
IMG_2721.jpg
Dongfeng EQ2102 Series Off-road Motor User Manual - Maintenance and Adjustment - tyre Inflatable
08-12 2021

tyre Inflatable device gas cylinder is equipped with a gas valve, tyre The inflation operation step is: 1. Remove the butterfly nut, twist the butterfly nut of the inflatable hose into the air valve interface, That is, the tyre is inflated; 2. Start the engine to start the air compressor to start the works of works HA-019. In the inflation process, the engine is kept at 1, the gas valve 1000R / min; 3. When the tyre The air pressure reaches the specified value, remove the inflatable hose, screw the pneumatic valve butterfly nut, then stop the engine operation .

READ MORE
_DSC57.jpg
Dongfeng EQ2102 Series Off-road Motor User Manual - Maintenance and Adjustment - Check for Brake Pedal Tour
08-12 2021

Check the brake pedal stroke to clear the brake pedal, check its free trip, the normal value is 12 ~ 18mm. The brake pedal should not be bleed. There should be exhaust sound when the pedal is relaxed. Adjusting the front wheel of the front wheel per 12,000km adjustment should be checked. The recommended value of the front wheel of this car is 2 ~ 5mm. The adjustment method of the front wheel beam is adjusted to adjust the front wheel, and the car should be parked on the horizontal site, jack the front bridge, so that the wheel is in linear driving position, remove the horizontal puller, release the horizontal lever joint Tight bolts, rotate the national head, adjust the horizontal pulley length, so that the front beam value required for the car row. When adjusting, you can make a \"+ \" word mark in the middle of the tread pattern of left and right tyre, in the front bridge square, then turn the marker to the positive number to measure the B value, then turn the mark to the front The a value is measured, the front lead is the difference between A and B. After adjusting, tighten the bolts on the clamp. After collecting water, it will

READ MORE
IMG_7683.jpg
Dongfeng EQ2102 Series Off-road Motor User Manual - Maintenance and Adjustment - Maintenance of Balance Bear Hubs
08-10 2021

The maintenance of the balance the bearing hub checks the balance bearing hub. The balanced hub lubricating oil is replaced each by 8,000 km. After the new car is completed, the U-shaped bolt nut of the steel plate spring should be tightened in the heavy-duty state; each running 12,000 km, the steel spring U-shaped bolt nut is fastened in the heavy-duty state. Before the examination, the rear steel sheet side surface clamping bolt is loose, and if there is loose moment, it must be tightened. Based on the side plates of the balance bearing hub, the steel plate bullet is moderately eliminating the clearance. Check the balance shaft bracket and frame, and the connecting bolts of the connecting axis are non-loosening. If there is a loose and provenance torque. The balance bearing hub axis adjusts 8,000 km cleaning, check and adjust the balance bearing hub. 1. Remove the balance bearing hub, release the locking bolts on the adjustment nut, tighten the adjustment nut / 1/4 ring, then at 170 ~ 220n.m

READ MORE
Hubei Off-Road Special Vehicle Co., Ltd.
Address: No. 6, Huimin Road, Maojian District, Shiyan City, Hubei Province, China
Tel: 86-719-8888190 Tel: 86-18986895008 / 86-18986890909 Email:fanya_trade@163.com
Copyright © 2021 Hubei Off-road Special Vehicle Co., Ltd. Record certificate number:Hubei ICP No. 20010516-3