tyre Inflatable device gas cylinder is equipped with a gas valve, tyre The inflation operation step is: 1. Remove the butterfly nut, twist the butterfly nut of the inflatable hose into the air valve interface, That is, the tyre is inflated; 2. Start the engine to start the air compressor to start the works of works HA-019. In the inflation process, the engine is kept at 1, the gas valve 1000R / min; 3. When the tyre The air pressure reaches the specified value, remove the inflatable hose, screw the pneumatic valve butterfly nut, then stop the engine operation .
When the direction of the steering wheel is freely rotating, when the swelling 2,000km maintenance, the amount of self-rotating of the drawing plate should be checked, and the amount of free rotation in the middle position cannot exceed 15 °. H-B-096 Plantation and Replacement Transmission Oil Quality Period Row 4,000km La Nan as the 0-speed gas refueling and oil surface inspection hole, the height of the oil surface with the row of twepight holes, not added. At the same time, it should also check the condition of ventilation and cleaning. Black heat cycle HA-0301, refueling and oil surface inspection hole 2, put oil-absorbing screw release 4,000km maintenance time to reduce the transmission of the transmission in the hot air condition In the middle of the mountain, the cleaning rush (the sputum is self-sufficiently adsorbed in the iron) of the iron), adding a new hole slip from the oil and oil surface inspection hole. I would like to burn the bearing and gear, which will cause overheating and oil leakage. Continuous ventilation
When the clutch operation is in use, the separation should be thoroughly; the clutch separation is not thoroughly a large mausya-kuka course of damage the clutch, regardless of the high-speed gear, the low speed file shift or by low speed, high-speed file shift, Sichuan Shooting method of high breeding. After completing the clutch operation, don't put your foot on the clutch pedal 6H-B-072]; the heat limit of the acoustic pole 4, quickly step on the pedal 6, first quickly the pedal to semi-engagement 5, shift Air supply, and slowly relax the clutch pedal, the faster and the faster
Intance preheating start operation
The new car walks through the new car, the mileage is set to 1,000 ~ 2,500km, and the new car is only passed to normal use after driving 2,500km. The new car has passed the strict running period, and the vehicle allocute pair and each unit have reached the most I, the performance of the vehicle can be effectively played. Otherwise, it will be due to insufficient power, and it is too early to load I Sichuan. The initial excessive wear of the part. The following provisions should be observed within the joint period of the new car: the car should be cleaned directly to the front and inspect the connection and fastening of each part. Check the amount of coolant storage and check the phenomenon of no leakage in the cooling system. Check the engine, clutch manipulation system, transmission, splitter, drive bridge, balance the oil surface of the bearing hub, the scooter and the turret, and insufficiently add, and inspect the phenomenon of no oil leaks in each part. Check that all parts of the steering mechanism have a loose and issuance. Check if the work of the brake system is normal, and the joints of each pipeline